Building (Forms) Amendment Regulations 2025
Building (Forms) Amendment Regulations 2025
Building (Forms) Amendment Regulations 2025
Checking for alerts... Loading...
2025/322

Building (Forms) Amendment Regulations 2025
Cindy Kiro, Governor-General
Order in Council
At Wellington this 15th day of December 2025
Present:
Her Excellency the Governor-General in Council
These regulations are made under section 402 of the Building Act 2004 on the advice and with the consent of the Executive Council and on the recommendation of the Minister for Building and Construction.
Regulations
1 Title
These regulations are the Building (Forms) Amendment Regulations 2025.
2 Commencement
These regulations come into force on 15 January 2026.
3 Principal regulations
These regulations amend the Building (Forms) Regulations 2004
4 Regulation 5 amended (Other forms)
(1)
In regulation 5, after the item relating to form 2, insert:
| 2AA | 33 | Application for project information memorandum for non-consented small stand-alone dwelling | ||
| 2AAB | 35 | Project information memorandum for non-consented small stand-alone dwelling | ||
| 2AAC | 35A | Additional information to accompany project information memorandum for non-consented small stand-alone dwelling |
(2)
In regulation 5, after the item relating to form 3, insert:
| 3A | 36(2A) | Development contribution notice: non-consented small stand-alone dwelling |
5 Schedule 2 amended
(1)
(2)
In Schedule 2, form 2A, replace “Section 30C or 45, Building Act 2004”
with “Section 30C, 45, or 45AA, Building Act 2004”
.
(3)
In Schedule 2, form 2A, under the heading “Declaration”
, replace paragraph (b) with:
(b)
if applicable, complies with the building code subject to any waiver or modification of the building code recorded on this form.
(4)
(5)
In Schedule 2, form 6A, under the heading “The project”
, replace “Building consent number:”
with:
*Building consent number:
or
*Project information memorandum record number for non-consented small stand-alone dwelling:
| *Select one. |
(6)
In Schedule 2, form 14, under the heading “Matter for determination”
, after paragraph (c)(iv) insert:
(v)
†allow/†refuse to allow an extension of the period during which the building work in connection with a non-consented small stand-alone dwelling must be completed before the project information memorandum lapses: [state details of the building work]
Schedule New forms inserted into Schedule 2
Part 1 New forms 2AA, 2AAB, and 2AAC inserted into Schedule 2
Form 2AA Application for project information memorandum for non-consented small stand-alone dwelling
Section 33, Building Act 2004
Building
Street address of site:
Proposed location of building within site:
Total floor area:
Owner
Name: [include preferred form of address, eg, Mr, Miss, Ms, Mrs, Dr, if an individual]
*Contact person:
| *Omit if the applicant is an individual. |
Mailing address:
Street address/Registered office*:
| *Select one. |
Phone: [specify preferred contact number for owner (mobile telephone or landline)]
Email address:
*Internet site:
| *Omit if owner does not have an internet site. |
The following evidence of ownership is attached to this application: [copy of record of title, lease, agreement for sale and purchase, or other document showing full name of legal owner(s) of building]
*Agent
| *Omit all details under this heading if the owner is not represented by an agent. |
Name:
†Contact person:
| †Omit if the agent is an individual. |
Mailing address:
Street address/Registered office*:
| *Select one. |
Phone: [specify preferred contact number for agent (mobile telephone or landline)]
Email address:
*Internet site:
| *Omit if agent does not have an internet site. |
Relationship to owner: [give details of authorisation from owner to make application on owner’s behalf]
First point of contact for communications with territorial authority: [specify full name, mailing address, phone number(s), and email address(es)‡]
| ‡Points of contact must be in New Zealand. |
Application
I request that you issue a project information memorandum for the non-consented small stand-alone dwelling described in this application.
Date:
Signature:
(owner/agent on behalf of and with authority of owner*)
| *Select one. |
Space for territorial authority use
Project
Description of proposed building work:*
*Include information about known natural hazards and how they are accounted for in designs and plans, and information about how the dwelling meets the requirements of a small stand-alone dwelling set out in clause 1 of Schedule 1A of the Building Act 2004, that is, that the dwelling has the following characteristics:
|
Previously issued building consents or project information memoranda (if any): [list]
Estimated value of building work: [specify estimated value as defined in section 7(1) of Building Act 2004]:
Name of builder (if known):
Project information memorandum
The following matters are involved in the proposed project:
*Alterations to land contours
*New or altered connections to public utilities
*New or altered access for vehicles
*Disposal of stormwater
*Disposal of wastewater
*Building work over any existing drains or sewers, or in close proximity to wells or water mains
*Other matters known to the applicant that may require authorisations from the territorial authority: [specify]
| *Select those matters that apply. |
Attachments
Attach the documents specified below.
The following documents are attached to this application:
Preliminary design plans for the proposed building work (which must include site plans, elevations, and basic sections and may also include floor plans)
*Product certificates
| *Omit if not applicable. |
Form 2AAB Project information memorandum for non-consented small stand-alone dwelling
Section 35, Building Act 2004
Building
Territorial authority project information memorandum record number:
Street address of site:
Legal description of land where building is proposed to be located:
Owner
Name:
*Agent
*Name:
| *Omit if not applicable. |
Project information memorandum
[Set out the information likely to be relevant to the proposed building work—
that identifies the heritage status of the building (if any):
that identifies each special feature of the land (if any):
that, in terms of any other Act, has been notified to the territorial authority by a statutory authority.]
Omit the following paragraph if it does not apply.
*The [name of issuing territorial authority] considers that the owner is likely to be required, under section 76 of the Fire and Emergency New Zealand Act 2017, to make provision for a scheme that provides for evacuation from the scene of a fire.
Omit the following paragraph if it does not apply.
*The [name of issuing territorial authority] considers that notification to Heritage New Zealand Pouhere Taonga is likely to be required under section 39 of the Building Act 2004.
Authorisations required or received
[Set out the following:
details of any existing stormwater or wastewater utility systems that relate to the proposed building work or are on, or adjacent to, the proposed building site:
details of any authorisations in respect of the proposed building work that the territorial authority can require or refuse (or that are available, are currently being considered, or have been received) (on its own behalf or on behalf of a network utility operator) under any Act other than the Building Act 2004. Include a statement of the requirements and the conditions of each authorisation. Note: this includes authorisations relating to drinking water, wastewater, and stormwater:
any information likely to be relevant to the proposed building work that has been notified to the territorial authority from a regional council or a water organisation.]
Next steps
If you intend to proceed with the building work, please note that all building work must be completed within 2 years after this project information memorandum is issued. If you require additional time, you must seek an extension to that time frame from the [name of issuing territorial authority]. Failure to comply with this condition may result in a notice to fix being issued.
Building work is considered complete once you have received all relevant records of work (including for plumbing and drainlaying work), certificates of compliance, and safety certificates for gas and electrical work. Once complete, you must provide those records, along with the final design plans and certificate(s) of design work, within 20 working days to the [name of issuing territorial authority] and pay any development contributions that have been charged alongside this project information memorandum.
If you do not proceed with any building work, please let the [name of issuing territorial authority] know as soon as possible.
Please note that a copy of the project information memorandum and additional information provided to you will now be on the property file and will appear on future land information memoranda.
Form 2AAC Additional information to accompany project information memorandum for non-consented small stand-alone dwelling
Section 35A, Building Act 2004
Building
Territorial authority project information memorandum record number:
Street address of site:
Owner
Name:
*Agent
*Name:
| *Omit if not applicable. |
Information on characteristics of non-consented small stand-alone dwelling
For this paragraph, select the statement that applies.
The [name of issuing territorial authority] considers that the proposed building work is likely/unlikely* to have the characteristics required by clause 1 of Schedule 1A of the Building Act 2004, which are that the building is stand-alone, is new, has a floor area that is equal to or less than 70 square metres, and has a single storey only.
| *Select one. |
or
The [name of issuing territorial authority] considers that it is unclear if the proposed building work is likely to have the characteristics required by clause 1 of Schedule 1A of the Building Act 2004, which are that the building is stand-alone, is new, has a floor area that is equal to or less than 70 square metres, and has a single storey only.
Information on natural hazards
For this paragraph, select the statement that applies.
The [name of issuing territorial authority] considers/does not consider* that the construction of the dwelling is proposed to occur on land that is, or is likely to be, subject to 1 or more natural hazards (within the meaning of section 71(3) of the Building Act 2004).
| *Select one. |
or
The [name of issuing territorial authority] considers that it is unclear whether the construction of the dwelling is proposed to occur on land that is, or is likely to be, subject to 1 or more natural hazards (within the meaning of section 71(3) of the Building Act 2004).
Include the following paragraph only if the territorial authority considers the land is or is likely to be subject to 1 or more natural hazards (within the meaning of section 71(3) of the Building Act 2004).
The natural hazard(s) that the [name of territorial authority] considers the land is likely to be subject to are—
*erosion (including coastal erosion, bank erosion, and sheet erosion)
*falling debris (including soil, rock, snow, and ice)
*subsidence
*inundation (including flooding, overland flow, storm surge, tidal effects, and ponding)
*slippage
| *Select the hazards that apply. |
For this paragraph, select the statement that applies.
The [name of issuing territorial authority] considers/does not consider* that the construction of the dwelling is likely to accelerate, worsen, or result in a natural hazard on that land or any other property.
| *Select one. |
or
The [name of issuing territorial authority] considers that it is unclear whether the construction of the dwelling is likely to accelerate, worsen, or result in a natural hazard on that land or any other property.
Include the following paragraph only if the territorial authority considers that the construction of the dwelling is likely to accelerate, worsen, or result in a natural hazard on that land or any other property.
The natural hazard(s) that the [name of territorial authority] considers the construction of the dwelling is likely to accelerate, worsen, or result in on that land or any other property are—
*erosion (including coastal erosion, bank erosion, and sheet erosion)
*falling debris (including soil, rock, snow, and ice)
*subsidence
*inundation (including flooding, overland flow, storm surge, tidal effects, and ponding)
*slippage
| *Select the hazards that apply. |
Include the following paragraph only if the territorial authority advises that there is or is likely to be a natural hazard present on the relevant land, or that the construction of the dwelling is likely to accelerate, worsen, or result in a natural hazard on the land or any other property.
Section 71(2) of the Building Act 2004 would/would not* apply to the construction work if Schedule 1A of that Act (which concerns small stand-alone dwellings that are exempt from the requirement for a building consent) did not apply.
| *Select one. |
Include the following paragraph only if section 71(2) of the Building Act 2004 would not apply.
A building consent may be required, or the preliminary design plans may need to be amended, or both, to adequately protect the land, building work, or other property from the natural hazard.
Other information
[Describe any bylaws that may affect the design, construction, or location of the dwelling.]
[Set out any other information concerning the land that the territorial authority considers to be relevant, for example—
information in the district plan and regional plan:
utility restrictions:
distance from power lines that may be present:
potentially contaminated ground:
allotments or internal boundaries that may be present on the land:
land covenants.]
Issuer
Date:
Signature:
Position:
On behalf of: [name of territorial authority]
Part 2 New form 3A inserted into Schedule 2
Form 3A Development contribution notice: non-consented small stand-alone dwelling
Section 36(2A), Building Act 2004
To: [name and address of owner]
For the non-consented small stand-alone dwelling referred to in the attached project information memorandum, the development contribution of $[contribution amount] must be paid within 20 working days after the completion of building work.
Note: Building work is considered complete when you have received all relevant records from relevant tradespeople (see section 42B(6) of the Building Act 2004). This includes records of work for building, plumbing, and drainlaying work and certificates of compliance and safety certificates for gas and electrical work.
The development contribution must be paid to [name of territorial authority and address(es) of place(s) where payment can be made].
If the development contribution is not paid,—
(a)
the [name of territorial authority] may, under section 252 of the Local Government Act 2002, recover money payable by a person to the local authority as a development contribution as a debt:
(b)
the [name of territorial authority] may, under section 208(1)(d) of the Local Government Act 2002, register the development contribution under subpart 5 of Part 3 of the Land Transfer Act 2017 as a charge on the title of the land in respect of which the development contribution was required.
Date:
Signature:
Position:
On behalf of: [name of territorial authority]
Nicola Purvis,
Acting Clerk of the Executive Council.
Explanatory note
This note is not part of the regulations but is intended to indicate their general effect.
These regulations, which come into force on 15 January 2026, amend the Building (Forms) Regulations 2004.
These regulations insert into Schedule 2—
new form 2AA for an application for a project information memorandum for a non-consented small stand-alone dwelling (commonly referred to as a granny flat):
new form 2AAB for the project information memorandum:
new form 2AAC for additional information to be supplied with the project information memorandum:
new form 3A for a development contribution notice for a granny flat.
They also amend—
regulation 5 so that those new forms must be used in relation to the matters in specified sections of the Building Act 2004 (the Act):
form 2A, which is the prescribed form for a certificate of work under section 30C or 45 of the Act, so that it will also be for a certificate of work for a granny flat under section 45AA of the Act:
form 6A, which is the prescribed form for a record of building work, to include the project information memorandum number for a granny flat:
form 14, which is the prescribed form for an application to the chief executive of the Ministry of Business, Innovation, and Employment for a determination under section 177 of the Act of various matters. The amendment adds to those matters a territorial authority’s decision to extend or not extend the period for completing building work on a granny flat before the project information memorandum lapses.
Issued under the authority of the Legislation Act 2019.
Date of notification in Gazette: 18 December 2025.
These regulations are administered by the Ministry of Business, Innovation, and Employment.
"Related Legislation
"Related Legislation
"Related Legislation
Versions
Building (Forms) Amendment Regulations 2025
Building (Forms) Amendment Regulations 2025
More
Building (Forms) Amendment Regulations 2025
RSS feed link copied, you can now paste this link into your feed reader.